by david | Jul 29, 2016 | Uncategorized
The microbrewery movement has taken hold throughout the nation’s heartland – and Cedar Rapids is no exception. The post-flood revitalization of the Downtown Corridor paved the way for brew pubs of all shapes and sizes, including the recently opened Iowa Brewing...
by david | Jul 7, 2016 | Uncategorized
West Plains Engineering provided mechanical and electrical studies to determine upgrades and improvements to The Manuel Brothers Park in Lead, SD. The park, which is named after the gold miners who first staked the Homestake gold claim in 1876, is located near the...
by david | Jul 7, 2016 | Uncategorized
West Plains Engineering provided electrical consulting engineering services for replacement of underground 5kV pump stations down to the 5,000 foot level of the Ross Shaft. Main power distribution is at 12kV and WPE designed the 5kV and 480V substations to...
by david | Jun 17, 2016 | news
Location: Rapid City, South Dakota Status: Bid Review Our Rapid City office is currently working with Chamberlin Architects to remodel 14 restrooms at the Rushmore Plaza Civic Center to meet ADA requirements. A popular event center, the Civic Center draws millions of...
by david | Jun 13, 2016 | news
When your business is crushing, shearing and shredding scrap metal for recycling, naturally its takes considerable power. But with such power comes great risk for electrical hazards. In 2015, we worked with Shine Brothers/TJN Enterprises to conduct...