WEB Water Development
Water Treatment Plant Expansion | Selby, SD
West Plains Engineering worked with WEB Water Development on an expansion to an existing water treatment plant in Aberdeen, SD.
The project added a third water train system to the existing water train building. This involved providing power to equipment, adding ventilation, and providing domestic water piping for cleaning the building.
Also included was the replacement of one high service pump and the addition of a third high service pump. Lastly, a boiler study of the existing heating system to see if the existing boilers are adequately sized for the building addition.
Construction Cost
$15 million
Date Completed
2021